Electrical work that respects your classified areas and your process.
GEM supports New Jersey chemical and process plants with Class I Div 1 and Div 2 hazardous-location installs, boiler, UPS and process utility power, planned shutdowns, and after-hours backup for your maintenance team.

Sound familiar?
- A hazardous area leaves no room for “close enough.” One unrated fixture, missing seal-off or wrong fitting is a safety problem and an audit finding.
- When a utility goes down, the process goes down. A failed boiler control or UPS can stop the whole plant, and drawings are often missing or out of date.
- Shutdowns are rare and expensive. A slipped window means waiting months for the next one.
- Your in-house electricians can’t cover every night and weekend. When something fails off-shift, you need a qualified crew who already knows the plant.
How GEM solves it
- Hazardous-location installs, rated end to end: Class I Div 1 and Div 2 explosion-proof lighting, sealed conduit and rated equipment in tank farms and process areas. We’ve installed explosion-proof seal-offs, IS barrier grounding and intrinsically safe sensor wiring, and our own EE-rated scissor lift is built for hazardous and specially rated spaces.
- Boiler, UPS and process utility power: Troubleshooting and repair of boiler controls, UPS replacement and right-sizing, and process power. Plus NFPA 70B programs under one contract: infrared surveys by certified thermographers, arc flash studies stamped by a licensed New Jersey Professional Engineer, and the corrective work (NFPA 70B maintenance).
- Shutdowns planned to the minute: Pre-walks with your facilities and EHS teams, materials staged and verified, and tools tested before the window opens.
- After-hours backup: Our foreman-led crews back up your maintenance team on nights and weekends, and can staff up for planned shutdowns. Our own 40-foot bucket truck handles exterior lighting and high-reach work without waiting on a rental.


Proof: Saturday call, boiler control panel down, no wiring diagram
On a Saturday in February, a chemical manufacturer in North Jersey called about its boiler control panel. That boiler feeds the plant’s entire water processing, so without it the plant can’t operate. We found a stripped fuse-block screw and loose wiring, with no wiring diagram to work from. Our crew sourced a 60A fuse block and terminal block, found two bad fuses, and replaced short wires with 105°C-rated wire. We checked every other termination in the panel, tested rotation, and ran the boiler once plant water pressure was restored. The repair was finished Monday.
Also from our chemical work: Class 1 Div 1 LED explosion-proof lighting for an outdoor tank area, on a custom steel support brace our team fabricated, and a right-sized UPS for a chemical plant server room.
Credentials
- NJ MBE and NJ SBE certified
- Prequalified: NJ DPMC · NJ SDA · NJ PWC
- ISNetworld member, ISN ID 400-559073
- EMR 0.891 (2026), below the 1.0 industry average
- OSHA 10 and OSHA 30 trained, scissor lift certified crews
- NJ Electrical Contractor License #15653
- Every crew is foreman-led
Founded in 2006 in Clifton, NJ. Approved vendor at regulated NJ pharma, chemical and medical device plants.
Book a 15-minute walk-through
of your hazardous-location, utility or shutdown scope. (973) 446-6200 · info@gem-electricalcontracting.com
Other plants we serve: Pharma & life science · Food processing · Bottling & beverage · Medical device
Frequently asked questions
Who does Class I Div 1 hazardous location electrical work at chemical plants in New Jersey?
GEM installs Class I Div 1 and Div 2 explosion-proof lighting, sealed conduit and rated equipment in tank farms and process areas of New Jersey chemical and process plants. A recent example was Class 1 Div 1 LED fixtures on a custom-fabricated support brace for an outdoor tank area. GEM’s own EE-rated scissor lift is built for hazardous and specially rated spaces.
Can an electrician repair a chemical plant boiler control panel with no wiring diagram?
Yes. When a North Jersey chemical manufacturer’s boiler control panel went down on a Saturday, GEM found a stripped fuse-block screw, loose wiring and two bad fuses, replaced short wires with 105°C-rated wire, checked every termination, tested rotation and ran the boiler once water pressure was restored. The repair was finished Monday.
How should an electrical shutdown at a chemical plant be planned?
GEM plans shutdowns with pre-walks alongside your facilities and EHS teams, stages and verifies materials, and tests tools before the window opens. Shutdowns are rare and expensive, and a slipped window can mean waiting months for the next one.
Is there after-hours electrical backup for chemical plant maintenance teams in NJ?
Yes. GEM’s foreman-led crews back up your maintenance team on nights and weekends when something fails off-shift. GEM is based in Clifton and serves plants in Bergen, Hudson, Passaic, Essex, Middlesex, Morris, Somerset and Union counties.
Can GEM help a chemical plant meet NFPA 70B?
Yes. GEM delivers NFPA 70B programs under one contract and one point of contact: infrared surveys by certified thermographers, arc flash studies stamped by a licensed New Jersey Professional Engineer, and the corrective work. Our crews open and prep the gear, correct the findings and install arc-flash labels.