Electrical work that respects your clean room and your production schedule.
GEM supports New Jersey pharma, life-science and medical device plants with work inside live ISO-classified clean rooms, GMP-documented close-outs, planned shutdowns, and after-hours backup for your maintenance team.

Sound familiar?
- Any outside crew in a classified space is a contamination risk. One careless tool or box can cost you a room recertification.
- Close-out paperwork arrives late, or not at all. QA can’t release the space without accurate panel schedules, labels and as-builts.
- Shutdowns are rare and expensive. A slipped window means waiting months for the next one.
- Your in-house electricians can’t cover every night and weekend. When something fails off-shift, you need a qualified crew who already knows the plant.
How GEM solves it
- Clean room protocol is part of our scope: Gowning, alcohol wipe-down of every tool and fastener, stainless disconnects and hardware, and controlled material entry. We’ve worked in ISO 5, 6 and 7 clean rooms.
- GMP-documented close-outs: Panel schedules, arc-flash labels, as-builts and inspection sign-offs delivered at turnover.
- Shutdowns planned to the minute: Pre-walks with your facilities and EHS teams, materials staged and verified, and tools tested before the window opens.
- After-hours backup: Our foreman-led crews back up your maintenance team on nights and weekends, and we pick up after hours when production is on the line. Our own 40-foot bucket truck handles exterior lighting and high-reach work without waiting on a rental.
Proof: clean room expansion for a North Jersey life-science manufacturer
This clean room expansion had a hard turnover date and required work inside a live clean room. Our crew fed VFDs, vacuum pumps, ultrasonic, argon and freeze-dryer equipment and the RO2 system on 480V three-phase with stainless-steel disconnects and rigid conduit. At three fume hoods, we installed explosion-proof seal-offs, IS barrier grounding and intrinsically safe sensor wiring. Grounding panels, mag-lock interlocks, lighting, arc-flash labels and panel schedules completed the job, and the above-ceiling inspection passed. Every screw and tool was alcohol-wiped before it went in.

Credentials
- NJ MBE and NJ SBE certified
- Prequalified: NJ DPMC · NJ SDA · NJ PWC
- ISNetworld member, ISN ID 400-559073
- EMR 0.891 (2026), below the 1.0 industry average
- OSHA 10 and OSHA 30 trained, scissor lift certified crews
- NJ Electrical Contractor License #15653
- Foreman-led crews
Approved vendor at regulated NJ pharma, chemical and medical device plants.
Book a 15-minute walk-through
of your clean room, lab or shutdown scope. (973) 446-6200
Frequently asked questions
Who does electrical work inside live ISO clean rooms at pharma plants in New Jersey?
GEM supports New Jersey pharma, life-science and medical device plants with work inside live ISO-classified clean rooms. Gowning, alcohol wipe-down of every tool and fastener, stainless disconnects and hardware, and controlled material entry are part of our scope. GEM has worked in ISO 5, 6 and 7 clean rooms.
Can an electrical contractor provide GMP close-out documentation?
Yes. GEM delivers panel schedules, arc-flash labels, as-builts and inspection sign-offs at turnover, so QA has what it needs to release the space.
How should an electrical shutdown in a pharma plant be planned?
GEM plans shutdowns with pre-walks alongside your facilities and EHS teams, stages and verifies materials, and tests tools before the window opens. Shutdowns are rare and expensive, and a slipped window can mean waiting months for the next one.
Is there after-hours electrical backup for pharma maintenance teams in NJ?
Yes. GEM’s foreman-led crews back up your maintenance team on nights and weekends when something fails off-shift.
What electrical work did a recent clean room expansion include?
For a North Jersey life-science manufacturer, GEM worked inside a live clean room against a hard turnover date, feeding process equipment on 480V three-phase with stainless-steel disconnects and rigid conduit. At three fume hoods, we installed explosion-proof seal-offs, IS barrier grounding and intrinsically safe sensor wiring, and the above-ceiling inspection passed.